Early access — pilot pricing

See ClearOps run on one of your streams

A 6-week pilot, one production stream, baseline (vs threshold) detection tuned to your data, and a drafted action plan in your team's hands within a week so you can judge the signal-to-noise before you scale the rollout.

Pilot operating brief

Pilot questions, answered for operations

Clear answers on scope, cadence, price, and what your team takes forward.

What's included in the pilot
Everything on this list is in scope — no upcharge for the ITSM routing, the human review, or the weekly walk-through.
  • Stream connector and baseline-learning window on your existing telemetry
  • Threshold-vs-baseline detection tuned to your daily / weekly / seasonal cycles
  • Drafted corrective action plan per flagged anomaly — affected systems, root-cause hypothesis, next three steps
  • Routing into the ITSM ticket your team already works (ServiceNow, Jira SM)
  • Human-in-the-loop review for every draft before it lands in the ticket
  • Weekly call to walk through the anomaly queue and adjust detection rules
What you'll have at week 6
By the end of the 6 weeks the pilot is over — but the artifacts are yours regardless of whether you continue.

A signal-to-noise answer

Concrete false-positive and true-positive counts on a stream you already monitor — not a vendor benchmark, your numbers.

A drafted-plan library

Every flagged anomaly during the pilot lands as a drafted corrective action plan your team can approve or amend — never a chart alone.

A rollout recommendation

A scope for the next 1–3 streams based on what your baselines actually surfaced — not a generic upsell deck.

How we run the pilot
Same shape every time — a short scope call, week 1 to baseline, weeks 2–5 to detect + draft, week-6 readout.
  1. 01

    30-min scope call

    We pick the single production stream to connect, agree on the success metric, and set the review cadence.

  2. 02

    Week 1 — connect + baseline

    Connector goes live; ClearOps reads your existing telemetry and builds the stream’s unique baseline (vs. fixed thresholds).

  3. 03

    Weeks 2–5 — detect and draft

    Every flagged anomaly during the pilot lands as a drafted action plan in your ITSM; the team reviews in-channel.

  4. 04

    End of week 6 — readout

    We sit down with the false-positive rate, the anomaly catalogue, and a recommendation for what to scale next.

Try it on your own metrics
Paste a JSON object or one stream per line below. We'll show what we'd flag before you commit to the pilot.

Accepts JSON object or key: value pairs — one stream per line. The last value is tested against the preceding baseline.

Apply for a pilot slot
Drop your work email. We'll come back within two business days with a scope-call invite and the connector list.
No pricing conversation until a plan has run on your data.
Get the Cautious pilot agreement as a PDF
Same scope the Cautious tier card on /pricing lists — narrow detection, weekly readout, every draft through a human reviewer first — in a downloadable agreement ready for procurement.

Free-text fields only — the rest of the prospectus is fixed for the Cautious tier.

Get the Aggressive pilot agreement as a PDF
Same scope the Aggressive tier card on /pricing lists — broader detection envelope, twice-weekly readout, multi-channel routing — in a downloadable agreement ready for procurement.

Free-text fields only — the rest of the prospectus is fixed for the Aggressive tier.

Get the Standard pilot agreement as a PDF
Same scope the /pricing tier card shows — the six inclusions, the price band, and the 6-week run shape — in a downloadable agreement ready for procurement.

Free-text fields only — the rest of the prospectus is fixed for the Standard tier.

Prepare for a Standard pilot kickoff
Use this one-page checklist to align stakeholders, prepare a representative data sample, confirm the KPI baseline and access, and book the weekly readout.
Already a signed pilot?
If your scope call is already done and you're ready to connect, jump straight to the day-zero intake. We start on connect this week.